The project involved the complete demolition of a pioneering timber-framed structure, the first of its kind in Europe to be dismantled. The scope included the full design and implementation of Temporary Works to ensure the safe and controlled removal of the building components. This was essential for providing structural support to the panels during lifting and subsequent demolition.

PROJECT DELIVERY

The demolition process required meticulous planning and a phased approach. The top 2 storeys of the building, comprising large Cross Laminated Timber (CLT) panels, was carefully lifted down using a crane and access equipment such as scaffolding or use of cherry pickers. This process was carried out in the reverse sequence of the original construction, ensuring stability and safety at every stage. Scaffolding was erected to facilitate safe access for operatives and to provide protection during the lifting operations. Once the upper panels were safely removed, the lower section of the structure was demolished using mechanical means. The project also included the removal of the slab and foundations to complete the site clearance.

THE OUTCOME

The project was successfully delivered with a strong emphasis on safety and structural integrity throughout. The use of bespoke Temporary Works and a considered deconstruction methodology enabled the safe demolition of a complex, pioneering structure. The result was a clear site, ready for future development, with all works completed in accordance with regulatory and environmental standards. This case set a precedent for the deconstruction of similar engineered timber buildings in the UK and across Europe.